12805 Shorewood drive sw
burien, wa 98146
Scope: Construction of 160' suspension bridge
Work Included: Installation of 2 - 500,000 lb concrete anchors; 2 concrete abutment walls, site preparation. Installation of bridge and architectural features, construction of walkways and roads, restoration and improvements.
Challenges: Work site was in a remote location where delivery of equipment and supplies was limited to small vehicles and all terrain vehicles. Concrete had to be pumped from over 500' away.
Contracted by City of Bellevue